On a beautiful day on the Labrador Sea a loud crack was heard: one wire stay snapped, a second - Dynex synthetic rope rigging - stretched. The mainmast popped out of its step on the deck. Jury rigging brought them to safe harbor 60 miles away. Damage above, details HERE in the July 26, 2010 post.
Standard, high, uniform quality
-
Friday – photo by Mitch Waxman This is the sort of post which I often
describe as being ‘serendipitous.’ After marveling at a rail yard, and a
bit of overb...
18 hours ago